Auditorium Upgrade Project
West Prep Academy
About This Grant
Installall hard wood floors on the auditorium stage, mirrors for dance classes backstage, new control room/projection room, electrical wiring for AV equipment, accommodating seats, curtains, lighting deck, lighting equipment, surround sound system, video projection system with monitors on the side and main stage, AV rack to control sound and visual input and output, a PPD system to broadcast throughout building and into atrium and garden space directly next to auditorium, acoustical panels, proper ventillation/air conditioning, and mosiac mural that reflects the technology and arts theme that runs through the building.
Focus Areas
How to Apply
Up to $0K
Rolling
One-time $99 fee · Includes AI drafting + templates + PDF export
AI Requirement Analysis
Detailed requirements not yet analyzed
Have the NOFO? Paste it below for AI-powered requirement analysis.