Skip to main content

Auditorium Upgrade Project

West Prep Academy

open

About This Grant

Installall hard wood floors on the auditorium stage, mirrors for dance classes backstage, new control room/projection room, electrical wiring for AV equipment, accommodating seats, curtains, lighting deck, lighting equipment, surround sound system, video projection system with monitors on the side and main stage, AV rack to control sound and visual input and output, a PPD system to broadcast throughout building and into atrium and garden space directly next to auditorium, acoustical panels, proper ventillation/air conditioning, and mosiac mural that reflects the technology and arts theme that runs through the building.

Focus Areas

educationartstechnologyinfrastructure

How to Apply

Funding Range

Up to $0K

Deadline

Rolling

Complexity
medium

One-time $99 fee · Includes AI drafting + templates + PDF export

AI Requirement Analysis

Detailed requirements not yet analyzed

Have the NOFO? Paste it below for AI-powered requirement analysis.

0 characters (min 50)