HRP Pier 40 Roof Repair & HRP Clinton Cove Lawn Upgrade
Hudson River Park Trust
About This Grant
(1) - Strip existing roof surface to remove the remainingineffective waterproofing membrane, demolish seteriorated concrete structural planks, repair and patch the existing concrete from the mezzanine level to maintain structural capacity sufficient for c
Focus Areas
environment
How to Apply
Funding Range
Up to $500K
Deadline
Rolling
Complexity
mediumOne-time $749 fee · Includes AI drafting + templates + PDF export
AI Requirement Analysis
Detailed requirements not yet analyzed
Have the NOFO? Paste it below for AI-powered requirement analysis.
0 characters (min 50)