Skip to main content

Phase II of Roof replacement Project

Metropolitan Opera Association, Inc.

open

About This Grant

Replace the roofing system over the 8th Floor Stafe Roof, and 7th Floor North and 7th Floor South Roofs (Siplast Roof-torched applied modified bitumen roofing system, including fully adjered insulation and cover board. Third floor South roof will be repla

Focus Areas

education

How to Apply

Funding Range

Up to $250K

Deadline

Rolling

Complexity
medium

One-time $749 fee · Includes AI drafting + templates + PDF export

AI Requirement Analysis

Detailed requirements not yet analyzed

Have the NOFO? Paste it below for AI-powered requirement analysis.

0 characters (min 50)