Art Piece on the South Main Street Retention Wall
InterIm CDA
About This Grant
InterIm Community Development Association and the Danny Woo Art Wall Steering Committee has selected an artist to develop a site integrated, community-based public art piece to be located on the retaining wall along the north side of S. Main Street outside the Danny Woo Community Garden entrance. The art piece will be installed on a concrete retaining wall, which is divided into panels with steel beams. The art piece has been funded to be at least 10 panels long. Additional funding, will allow us to extend the art along additional panels and add lighting. This project will be completed by December 31, 2018.
Focus Areas
How to Apply
Up to $5K
Rolling
One-time $99 fee · Includes AI drafting + templates + PDF export
AI Requirement Analysis
Detailed requirements not yet analyzed
Have the NOFO? Paste it below for AI-powered requirement analysis.