John Hay Playground Construction Documents
John Hay Foundation
About This Grant
The John Hay Foundation will hire design professionals to create surveys, geotechnical reports, permit applications, 100% construction documents, and construction cost estimates for the playground area of John Hay Elementary School located at 201 Garfield St. The work will take place between September 2017 and March 2018. This scope of work will be based on an existing conceptual plan that was created with significant community input.
Focus Areas
educationinfrastructure
How to Apply
Funding Range
Up to $25K
Deadline
Rolling
Complexity
mediumOne-time $99 fee · Includes AI drafting + templates + PDF export
AI Requirement Analysis
Detailed requirements not yet analyzed
Have the NOFO? Paste it below for AI-powered requirement analysis.
0 characters (min 50)