Skip to main content

John Hay Playground Phase 2 Construction

John Hay Foundation

open

About This Grant

The John Hay Foundation will hire a professional contractor to install a play structure and artificial turf mounds in the public area at John Hay Elementary School located at 201 Garfield St. The work will take place during fall 2018 and will be based upon a conceptual design created with significant public input.

Focus Areas

educationinfrastructure

How to Apply

Funding Range

Up to $100K

Deadline

Rolling

Complexity
medium

One-time $249 fee · Includes AI drafting + templates + PDF export

AI Requirement Analysis

Detailed requirements not yet analyzed

Have the NOFO? Paste it below for AI-powered requirement analysis.

0 characters (min 50)