Skip to main content

Cayton Corner Park Final Design Documents & Permit

Friends of Cayton Corner Park

open

About This Grant

The Friends of Cayton Corner Park will continue work with a landscape architecture firm to complete final design documents and obtain permits for construction of a park at 1831 E Madison St. At SPR's request, a water meter will be added to the existing water connection from the adjoining building. Documents and permitting for subsequent construction will be completed by August 2019.

Focus Areas

environmentinfrastructure

How to Apply

Funding Range

Up to $65K

Deadline

Rolling

Complexity
medium

One-time $249 fee · Includes AI drafting + templates + PDF export

AI Requirement Analysis

Detailed requirements not yet analyzed

Have the NOFO? Paste it below for AI-powered requirement analysis.

0 characters (min 50)