Cayton Corner Park Final Design Documents & Permit
Friends of Cayton Corner Park
About This Grant
The Friends of Cayton Corner Park will continue work with a landscape architecture firm to complete final design documents and obtain permits for construction of a park at 1831 E Madison St. At SPR's request, a water meter will be added to the existing water connection from the adjoining building. Documents and permitting for subsequent construction will be completed by August 2019.
Focus Areas
environmentinfrastructure
How to Apply
Funding Range
Up to $65K
Deadline
Rolling
Complexity
mediumOne-time $249 fee · Includes AI drafting + templates + PDF export
AI Requirement Analysis
Detailed requirements not yet analyzed
Have the NOFO? Paste it below for AI-powered requirement analysis.
0 characters (min 50)