Skip to main content

Construct a 2-mile extension of the Sue Grossman Still River Greenway into downtown Winsted, and prepare final design & construction plans for the remaining connection to downtown Torrington.

DEEP

open

About This Grant

Construct a 2-mile extension of the Sue Grossman Still River Greenway into downtown Winsted, and prepare final design & construction plans for the remaining connection to downtown Torrington.

Focus Areas

environmentinfrastructure

How to Apply

Funding Range

Up to $1.8M

Deadline

Rolling

Complexity
medium

One-time $749 fee · Includes AI drafting + templates + PDF export

AI Requirement Analysis

Detailed requirements not yet analyzed

Have the NOFO? Paste it below for AI-powered requirement analysis.

0 characters (min 50)